This past week saw more work on the fireplace in the master bedroom, railing for the staircase and upper terraces, leveling of the backyard, and almost all the exterior bricks have been plastered prior to painting. The first photo above shows a shot taken from the backyard. You can see the lot has been leveled and the bricks have been plastered.
The photo below shows the staircase railings. Glass will be installed into the openings between rails.
The photo below shows the terrace railings. The picture is taken from the back yard looking up toward the living room.
The photo below is taken from inside the living room looking out toward the garden.
This picture shows the corner fireplace in the master bedroom.
The final photo is taken from the street above our house. You can see that most of the brick work has been plastered over. Next will be the exterior painting, we have not considered any colors yet. After the marble is afixed to the center column we will look for contrasting colors for the house.

2 Comments:

At 1:48 PM, Anonymous Anonymous said...

HI,DAVID LOVE MOM

 
At 10:25 AM, Anonymous Anonymous said...

I love the railings and using glass inserts is brilliant. Nothing to obstruct that lovely view and it will let in much more light. I can't believe how beautifully it's all coming together.

Yvette

 

Post a Comment

<< Home