Dec. 11-17, 2006


This past week work was concentrated on finishing the roof and plastering the outside walls of the house. The roof is almost done, we just need a coating of water impermeable paint over the cement. The roof has been sloped so that all the rain water will run off into drain pipes. There is just a small amount of outside plastering before a primer paint covering is applied. Plastering of the inside walls is completed. The truck out front is delivering floor tile. The first three pictures show the house from three different angles. There are very few red bricks still visible.
y
The photo below shows the ceiling fan that was just installed in the gazebo.
The photo below shows some of the tile that was delivered Saturday. Architect Arturo tells me that the men will lay the tile in the dining room this week. Sandra is visiting her mother and son in Ameca and he wants to surprise her when she returns. I will be leaving Monday morning to take the bus to meet Sandra and return to Morelia with her later in the week. Hope the tile is finished in the dining room when we return. Merry Christmas to everyone, because my next posting won't be til after Christmas.

1 Comments:

At 1:23 PM, Anonymous Anonymous said...

Hmmm, guess you weren't in by Christmas (unless you're camping). The place is looking more lovely by the week. I can hardly wait to see the tile installed.

Yvette

 

Post a Comment

<< Home