Wednesday, January 17, 2007

Tres Marias Residential Golf
Home Construction Week 32
January 8-14, 2007

Our house is beginning to look like our future home. This past week saw most of the tile flooring completed, tile going into the master bedroom, marble on the garage wall, most of the front sidewalk completed and the first glass installed in the master bedroom and entry skylight. The two photos below show the master bedroom. One wall has glass, floor tile completed, fireplace nearly complete. We just need glass in the two windows on the left and painting. On the outside of the glass is a terrace off the master bedroom.
The photo below looks up toward the skylight in the entry way. The glass is in and when the sun hits the beams we get very interesting reflections and shadows in the entry.
The photo below shows the beginning of the tile work in the master bathroom. There is still tile work to be laid above the green and white trim.

The final picture below shows some of the marble that will face on wall in the garage. This is the large unfinished concrete wall that can be better seen in the first photo in this blog. This entire wall will be covered with this marble. It is the same marble on the fireplaces. Sandra and I really like the finished look.

0 Comments:

Post a Comment

<< Home